Project Details

The existing single glazed steel windows and doors were replaced with aluminum double glazed door and window systems, improving the thermal efficiency of the building envelope.

  • Refenestration of the whole building including windows, doors and curtain walling
  • Reroofing and renewal of rooflights and rainwater goods
  • Rebuilding of brickwork balustrades and new copings
  • Repointing and clean of brickwork and Portland stone

Value of Contract - £350k re-roofing, £650k window replacement
Contract Start - January 2011
Duration - 19 weeks

Services delivered

  • Feasibility study
  • Site survey, detailed design and specification
  • Statutory approvals
  • Project management
  • Cost management
  • Contract administration
  • CDM-C services

The existing single glazed steel windows and doors were replaced with aluminium double glazed door and window systems, improving the thermal efficiency of the building envelope.

Thermal improvements were also undertaken while recovering the roof and the capacity of rainwater drainage was increased.

The building was fully operational during the works and was phased to accommodate critical dates for exams and conferences.

The Diamond Building case study
The Diamond Building

Project ServicesQuality Monitoring

We worked closely with the University of Sheffield, design team and contractor to ensure that this outstanding building was delivered to the required quality.

Read more
Bradford College case study
Bradford College

Access ConsultancyStrategic Asbestos AdviceSurveySurveying Services

We carried out a comprehensive review of the property portfolio in support of a strategic redevelopment of the College.

Read more